Back

CEM responds to power outage incident

Macau, 15 April 2015

CEM responds to the power outage incident happened at 11am which was due to the malfunction of the high voltage equipment in Canal dos Patos Substation. The incident affected a wide range of areas in Macau.

To stabilize electricity supply, CEM immediately takes emergency measures by activating the Coloane power generation units. The power grid is now stable and power restoration begins.

Previous
Next
Download CEM APP
google pay app store
© 2025 Companhia de Electricidade de Macau - CEM, S.A. All rights reserved.
CEM Website Terms of Use | Personal Data Collection Statement | Stay alert for phishing